800-597-2180 Credit APP Search
Soil Confinement System Repairs Eroded Dikes

Soil Confinement System Repairs Eroded Dikes

Originally published by Presto Geosystems and BOE Report Project Challenge: Repair 9,300 sm (100,000 sf) of eroding primary and secondary dikes around a Liquid Natural Gas (LNG) storage tank. The original asphalt cover had deteriorated along the face of the dike...